Construction estimating glossary

154 terms from the bid packet, each defined in plain words. Select a term for an example and what to do about it.

A

Addendum
An addendum is a written change to the bid documents that the design team issues before bids are due. It becomes part of the contract.
Allowance
An allowance is a set amount that every bidder must carry for work the documents do not fully define yet.
Alternate
An alternate is a separate price for a defined change to the base bid. The owner can accept or reject it at award.
As-built drawings
As-built drawings show the work as the contractor installed it, with field changes marked on the contract drawings.
Assembly
An assembly is a group of materials and labor that an estimator prices as one unit. One wall type per linear foot is an example.

B

Backcharge
A backcharge is a cost that one party deducts from money it owes another party. It covers damage, cleanup or work the other party left undone.
Base bid
The base bid is the price for the work in the bid documents, before any alternates are added or deducted.
Basis of design
The basis of design is the specific manufacturer and model the designer used to design the project. Other products must match it.
Bid bond
A bid bond is a surety's guarantee. If the bidder wins, it will sign the contract and provide the required bonds.
Bid day
Bid day is the day bids are due. Subcontractors send prices to general contractors, and general contractors send their bid to the owner.
Bid form
The bid form is the owner's document for the bid. Bidders fill in their price, alternates, unit prices and addenda received.
Bid invitation
A bid invitation is a notice from a general contractor or owner that asks a company to bid a project.
Bid leveling
Bid leveling is how a general contractor compares subcontractor bids for one trade by adjusting each to the same scope.
Bid opening
A bid opening is the set time when the owner opens the sealed bids. On public work, the prices are usually read aloud.
Bid packet
A bid packet is the full set of files a bidder receives: drawings, Project Manual, addenda and bid forms.
Bid protest
A bid protest is a formal challenge to how a public owner ran a bid or chose the winner.
Bid tab
A bid tab, or bid tabulation, is a table of each bidder and price for a project or one trade.
Bill of materials
A bill of materials lists every material item a job needs, with the quantity and description of each.
BIM
BIM stands for Building Information Modeling. It is a 3D model of a building in which each object carries data such as size and type.
Blueprint
A blueprint is a construction drawing. The word comes from an old printing process that made white lines on blue paper.
Board foot (BF)
A board foot is a unit of lumber volume. It equals a board 1 in thick, 12 in wide and 12 in long.
Bond
In construction, a bond is a surety company's guarantee that a contractor will meet a stated duty. Examples are finishing the work and paying suppliers.
Buyout
Buyout is the period after a general contractor wins a job. The GC awards subcontracts and purchase orders for each trade.
By others
By others is a note that says someone outside your scope will provide or install the item. The note does not say who.

C

Change order
A change order is a signed change to the contract after award. It adjusts the scope, the price, the time or all three.
Chief estimator
A chief estimator leads the estimating group. The chief decides which jobs to bid, reviews estimates and approves the final price.
Civil drawings
Civil drawings show the site work: grading, utilities, paving, drainage and erosion control. Their sheet numbers usually start with C.
Closeout
Closeout is the end stage of a project. The contractor finishes punch list work and turns in the required documents.
Conceptual estimate
A conceptual estimate is an early cost estimate made before the design is drawn in detail. It uses size, building type and past costs.
Constructability
Constructability is how practical a design is to build. A constructability review looks for details that are hard, slow or impossible to build.
Construction documents
Construction documents are the final drawings and specifications that contractors bid and build from. People shorten the term to CDs.
Contingency
Contingency is money held in an estimate or budget for costs that are likely but not yet known.
Contract documents
The contract documents are everything that forms the contract: the agreement, the conditions, the drawings, the specifications and the addenda.
Coordination drawings
Coordination drawings show the work of several trades together, so that ducts, pipes, conduit and structure do not clash.
Cost code
A cost code is a number a contractor assigns to a type of work. It tracks budget and actual cost on a job.
Count
A count is a takeoff quantity found by counting items one by one. Doors, light fixtures and floor drains are examples.
CSI
CSI is the Construction Specifications Institute. It publishes MasterFormat, the numbering system most US commercial specifications use.
Cubic yard (CY)
A cubic yard is a unit of volume equal to 27 cubic feet. Concrete, soil, gravel and mulch are measured in cubic yards.
Cut sheet
A cut sheet is a manufacturer's data sheet for one product. It shows the model, sizes, options and performance.

D

Davis-Bacon
Davis-Bacon is the US federal law that requires contractors to pay prevailing wages on federally funded construction projects.
Delegated design
Delegated design makes the contractor responsible for engineering part of the work, within criteria the designer sets.
Design development
Design development is the design phase between schematic design and construction documents. People shorten the term to DD.
Design-build
Design-build is a delivery method. One company holds a single contract with the owner for both design and construction.
Detail
A detail is a large-scale drawing of a small part of the work. It shows how the pieces fit together.
Direct cost
A direct cost is a cost tied to one specific job: labor, material, equipment and subcontracts used to build it.
Division 01
Division 01 is General Requirements in MasterFormat. Its sections set the administrative rules that apply to every trade on the job.
Door schedule
A door schedule is a table on the drawings with one row per door opening. It gives size, type, material, frame, rating and hardware set.
Drawing set
A drawing set is the full group of plan sheets for a project, ordered by discipline from civil through electrical.

E

Each (EA)
Each, written EA, is the unit of measure for items counted one by one.
Elevation
An elevation is a drawing that shows a vertical face of the building or a wall, viewed straight on. It also means a height above a reference point.
Escalation
Escalation is the rise in labor or material cost between the bid date and the date of purchase or installation.
Estimate
An estimate is a contractor's calculation of what a job will cost to build. It covers quantities, labor, material, equipment, overhead and profit.
Estimator
An estimator is the person who works out what a job will cost. The estimator reads the documents, takes off quantities and prices them.
Exclusion
An exclusion is a statement in a proposal that names work the bidder has not priced and will not perform.

F

Finish schedule
A finish schedule is a table on the drawings. It lists the floor, base, wall and ceiling finish for each room.
Fixture schedule
A fixture schedule is a table on the drawings. It lists each fixture type with its tag, description, manufacturer and model.
Front-end documents
Front-end documents are the bidding and contract sections at the start of the Project Manual. They are usually Division 00 and Division 01.
Furnish and install
Furnish and install means the contractor supplies the item and puts it in place. Furnish alone means supply only.

G

General conditions
General conditions are the standard contract terms. They set the rights and duties of the owner, the contractor and the architect.
General contractor
A general contractor holds the contract with the owner for the whole project. It hires subcontractors for most of the trade work.
General notes
General notes are written instructions on the drawings. They apply to a whole sheet, a whole discipline or the whole project.

H

Hard bid
A hard bid is a competitive lump sum bid on complete documents. The lowest responsive, responsible bidder usually wins.

I

Inclusion
An inclusion is a statement in a proposal that names the work the bidder has priced and will perform.
Indirect cost
An indirect cost supports the work but is not tied to one installed item. Examples are supervision, the job trailer and office overhead.
Instructions to bidders
Instructions to bidders is the front-end document that states the rules for preparing and submitting a bid.
Invitation to bid
An invitation to bid is a notice that asks contractors to bid a project. It gives the scope, the bid date and where to get the documents.

K

Keynote
A keynote is a numbered or lettered tag on a drawing. It points to a note in a list on the same sheet.

L

Labor burden
Labor burden is the cost an employer pays on top of base wages: payroll taxes, workers compensation insurance and benefits.
Labor unit
A labor unit is the number of labor hours needed to install one unit of an item. Examples are hours per fixture or per linear foot.
Lead time
Lead time is the time between placing an order and receiving the material on site. It includes submittal approval and manufacturing.
Legend
A legend is a key on the drawings that shows what each symbol, line type, hatch pattern and abbreviation means.
Linear foot
A linear foot is one foot of length, measured in a straight line along an item. Width and height do not count. It is written LF.
Liquidated damages
Liquidated damages are a set amount per day that the contract charges the contractor if the work finishes late.
Low bidder
The low bidder is the company with the lowest price among the bids received.
Lump sum
A lump sum is one fixed price for a defined scope of work. The contractor carries the risk of quantity and cost.

M

Margin
Margin is the part of the selling price that is left after cost. It is stated as a percent of the price.
Markup
Markup is the amount added to cost to reach the selling price. It is stated as a percent of cost.
MasterFormat
MasterFormat is the standard numbering system for construction specifications in the US and Canada. It sorts work into 50 divisions.
Material quote
A material quote is a supplier's price for a list of materials. The quantities come from the contractor or the supplier's own takeoff.
Material takeoff
A material takeoff is a list of the materials a job needs, with quantities measured or counted from the drawings.
Means and methods
Means and methods are the ways a contractor chooses to build the work: the techniques, sequence, equipment and temporary supports.
Mock-up
A mock-up is a full-size sample of part of the work. The architect approves its look and quality before the rest goes in.

N

NIC (not in contract)
NIC means not in contract. It marks an item that is shown on the drawings for reference but is not part of this construction contract.
Notice to proceed
A notice to proceed is the owner's written notice that tells the contractor to start work. It usually sets the start of the contract time.

O

OFCI
OFCI means owner furnished, contractor installed. The owner buys the item and the contractor installs it.
OFOI
OFOI means owner furnished, owner installed. The owner buys and installs the item, outside the construction contract.
On-screen takeoff
On-screen takeoff is measuring and counting from digital plan sheets on a computer. It replaces paper prints and a scale ruler.
One-line diagram
A one-line diagram is an electrical drawing that shows the power system with single lines and symbols. It runs from service to panels.
Or equal
Or equal is spec language that lets a bidder offer a product other than the one named. The product must match the named one.
Overhead
Overhead is the cost of running the company that no single job pays for directly. Examples are office rent, office staff and insurance.
Owner furnished
Owner furnished means the owner supplies the item. The contractor does not buy it, but may still have to install it.

P

Panel schedule
A panel schedule is a table on the electrical drawings. It lists each circuit in a panelboard, with its breaker size and load.
Payment bond
A payment bond is a surety's guarantee that the contractor will pay its subcontractors, suppliers and workers for the project.
Performance bond
A performance bond is a surety's guarantee that the contractor will complete the work as the contract requires.
Plan room
A plan room is a place, now usually a website. Contractors use it to find projects out for bid and download the bid documents.
Plan sheet
A plan sheet is one page of the drawing set. Each sheet has a number, a title and a title block.
Plumbing riser
A plumbing riser is a schematic drawing. It shows waste, vent and water piping as it runs up through the building.
Pre-bid meeting
A pre-bid meeting is held by the owner or architect before bid day. They explain the project and answer bidder questions.
Pre-construction
Pre-construction is the phase before work starts on site. It covers budgets, estimates, schedule planning, design review and buyout.
Prequalification
Prequalification is a review that an owner or general contractor uses to approve a company before that company may bid.
Prevailing wage
Prevailing wage is the minimum hourly wage and fringe rate that a public project requires for each trade classification.
Prime contractor
A prime contractor holds a contract directly with the owner. Subcontractors hold contracts with the prime, not with the owner.
Project Manual
The Project Manual is the bound book of written bid and contract documents. It holds the bidding requirements, contract conditions and specifications.
Proposal
A proposal is the written offer a contractor sends. It states the price, the scope, the inclusions, the exclusions and the terms.
Punch list
A punch list is the list of incomplete or defective items the architect or owner finds near project completion.

Q

Qualification
A qualification is a statement in a bid that explains an assumption or a condition behind the price.
Quantity survey
A quantity survey is a complete, detailed measurement of all the materials and work in a project. It comes from the drawings.
Quantity takeoff
A quantity takeoff is the list of measured and counted quantities for a job. It comes from the drawings and specifications.

R

Record drawings
Record drawings are the final set of drawings. They show the project as built, including changes made during construction.
Reflected ceiling plan (RCP)
A reflected ceiling plan is a drawing of the ceiling as if a mirror on the floor reflected it. It shows ceiling types, heights and devices.
Responsible bidder
A responsible bidder is a company that has the ability, the resources and the record to perform the contract.
Responsive bid
A responsive bid is a bid that meets every requirement of the bid documents in form, content and timing.
Retainage
Retainage is a share of each progress payment that the owner holds back until the work is complete.
Revision cloud
A revision cloud is a scalloped outline on a drawing that marks an area changed since the last issue.
RFI (request for information)
An RFI is a written question to the architect or owner. It asks about something unclear, missing or in conflict.
RFP (request for proposal)
An RFP is a request for an offer that the owner scores on more than price. Approach, team and schedule also count.
RFQ (request for quote or qualifications)
RFQ has two meanings. It can mean a request for a price quote, or a request for a firm's qualifications without a price.
Riser diagram
A riser diagram is a schematic drawing that shows how a system runs vertically through a building, floor by floor.
Room finish schedule
A room finish schedule is a table that lists the floor, base, wall and ceiling finish for each room.
Rough order of magnitude (ROM)
A rough order of magnitude is an early cost estimate made with little design information. It gives a range, not a firm price.

S

Schedule of values (SOV)
A schedule of values is a breakdown of the contract sum into line items. The contractor bills against it each month.
Schematic design (SD)
Schematic design is the first design phase. The drawings show the general layout, size and look of the building, with few details.
Scope gap
A scope gap is work the project needs that no bidder has included in a price.
Scope letter
A scope letter is a written statement from a subcontractor that lists what the bid includes, excludes and assumes.
Scope of work
The scope of work is the full description of what one party must do under a contract or a bid.
Scope review
A scope review is a meeting or checklist. The general contractor and a subcontractor confirm exactly what the sub's price includes.
Section (drawing)
A section is a drawing that shows a building or a part of it as if cut through vertically. It shows what is inside.
Sheet index
A sheet index is the list of every drawing sheet in the set, by number and title. It is usually on the cover sheet.
Shop drawing
A shop drawing is a drawing made by a contractor, fabricator or supplier. It shows exactly how they will build the work.
Site plan
A site plan is a drawing of the whole property from above. It shows the building, paving, utilities, grading and property lines.
Soils report
A soils report, or geotechnical report, describes the ground under a site. It is based on borings and lab tests.
Spec book
Spec book is the common name for the Project Manual, the bound volume of bidding requirements, contract conditions and specifications.
Spec section
A spec section is one numbered part of the specifications. It covers one type of work, such as 09 51 00 Acoustical Ceilings.
Specification
A specification is the written part of the contract documents. It states the products, the quality and the installation rules for the work.
Square (roofing)
A square is a roofing unit equal to 100 square feet of roof surface.
Square foot (SF)
A square foot is a unit of area equal to a square that is 1 ft on each side. Estimators write it as SF.
Structural drawings
Structural drawings show the parts that hold the building up: foundations, columns, beams, slabs, framing and connections.
Sub bid
A sub bid is the price and scope a subcontractor sends to a general contractor for one trade.
Subcontractor
A subcontractor is a company that does one part of the work. Its contract is with the general contractor, not the owner.
Submittal
A submittal is a document or sample a contractor sends to the architect before it orders. It shows what the contractor will furnish.
Substitution request
A substitution request is a formal request to use a product other than the one the specification names.
Supplementary conditions
Supplementary conditions are contract terms that change or add to the general conditions for one specific project.
Supplier quote
A supplier quote is a written price from a supplier or manufacturer for the materials or equipment on a job.

T

Takeoff
A takeoff is the work of measuring and counting everything a job needs from the drawings and specs. It is also the list that results.
Takeoff sheet
A takeoff sheet is the form or spreadsheet where an estimator records each item, quantity, unit and source.
Tax exempt
Tax exempt means the project owner does not pay sales tax on some or all purchases for the project.
Time and materials (T&M)
Time and materials is a way to pay for work by actual labor hours and material cost. Rates and markups are agreed in advance.
Title block
A title block is the bordered area on a drawing sheet. It holds the project name, sheet number, title, date, scale and revisions.

U

Unit of measure (UOM)
A unit of measure is the unit a quantity is counted or measured in. Examples are each, linear foot, square foot and cubic yard.
Unit price
A unit price is a fixed price for one unit of work. Examples are a cubic yard of rock excavation or a linear foot of pipe.

V

Value engineering (VE)
Value engineering is a review of the design. It looks for ways to lower cost while the building still does its job.

W

Wall type
A wall type is a coded wall assembly on the drawings. The code tells you the studs, the layers, the insulation and the rating.
Warranty
A warranty is a written promise to repair or replace defective work or products for a stated period after completion.
Waste factor
A waste factor is the extra material an estimator adds to the measured quantity. It covers cuts, breakage, laps and layout loss.