Construction estimating glossary
154 terms from the bid packet, each defined in plain words. Select a term for an example and what to do about it.
A
- Addendum
- An addendum is a written change to the bid documents that the design team issues before bids are due. It becomes part of the contract.
- Allowance
- An allowance is a set amount that every bidder must carry for work the documents do not fully define yet.
- Alternate
- An alternate is a separate price for a defined change to the base bid. The owner can accept or reject it at award.
- As-built drawings
- As-built drawings show the work as the contractor installed it, with field changes marked on the contract drawings.
- Assembly
- An assembly is a group of materials and labor that an estimator prices as one unit. One wall type per linear foot is an example.
B
- Backcharge
- A backcharge is a cost that one party deducts from money it owes another party. It covers damage, cleanup or work the other party left undone.
- Base bid
- The base bid is the price for the work in the bid documents, before any alternates are added or deducted.
- Basis of design
- The basis of design is the specific manufacturer and model the designer used to design the project. Other products must match it.
- Bid bond
- A bid bond is a surety's guarantee. If the bidder wins, it will sign the contract and provide the required bonds.
- Bid day
- Bid day is the day bids are due. Subcontractors send prices to general contractors, and general contractors send their bid to the owner.
- Bid form
- The bid form is the owner's document for the bid. Bidders fill in their price, alternates, unit prices and addenda received.
- Bid invitation
- A bid invitation is a notice from a general contractor or owner that asks a company to bid a project.
- Bid leveling
- Bid leveling is how a general contractor compares subcontractor bids for one trade by adjusting each to the same scope.
- Bid opening
- A bid opening is the set time when the owner opens the sealed bids. On public work, the prices are usually read aloud.
- Bid packet
- A bid packet is the full set of files a bidder receives: drawings, Project Manual, addenda and bid forms.
- Bid protest
- A bid protest is a formal challenge to how a public owner ran a bid or chose the winner.
- Bid tab
- A bid tab, or bid tabulation, is a table of each bidder and price for a project or one trade.
- Bill of materials
- A bill of materials lists every material item a job needs, with the quantity and description of each.
- BIM
- BIM stands for Building Information Modeling. It is a 3D model of a building in which each object carries data such as size and type.
- Blueprint
- A blueprint is a construction drawing. The word comes from an old printing process that made white lines on blue paper.
- Board foot (BF)
- A board foot is a unit of lumber volume. It equals a board 1 in thick, 12 in wide and 12 in long.
- Bond
- In construction, a bond is a surety company's guarantee that a contractor will meet a stated duty. Examples are finishing the work and paying suppliers.
- Buyout
- Buyout is the period after a general contractor wins a job. The GC awards subcontracts and purchase orders for each trade.
- By others
- By others is a note that says someone outside your scope will provide or install the item. The note does not say who.
C
- Change order
- A change order is a signed change to the contract after award. It adjusts the scope, the price, the time or all three.
- Chief estimator
- A chief estimator leads the estimating group. The chief decides which jobs to bid, reviews estimates and approves the final price.
- Civil drawings
- Civil drawings show the site work: grading, utilities, paving, drainage and erosion control. Their sheet numbers usually start with C.
- Closeout
- Closeout is the end stage of a project. The contractor finishes punch list work and turns in the required documents.
- Conceptual estimate
- A conceptual estimate is an early cost estimate made before the design is drawn in detail. It uses size, building type and past costs.
- Constructability
- Constructability is how practical a design is to build. A constructability review looks for details that are hard, slow or impossible to build.
- Construction documents
- Construction documents are the final drawings and specifications that contractors bid and build from. People shorten the term to CDs.
- Contingency
- Contingency is money held in an estimate or budget for costs that are likely but not yet known.
- Contract documents
- The contract documents are everything that forms the contract: the agreement, the conditions, the drawings, the specifications and the addenda.
- Coordination drawings
- Coordination drawings show the work of several trades together, so that ducts, pipes, conduit and structure do not clash.
- Cost code
- A cost code is a number a contractor assigns to a type of work. It tracks budget and actual cost on a job.
- Count
- A count is a takeoff quantity found by counting items one by one. Doors, light fixtures and floor drains are examples.
- CSI
- CSI is the Construction Specifications Institute. It publishes MasterFormat, the numbering system most US commercial specifications use.
- Cubic yard (CY)
- A cubic yard is a unit of volume equal to 27 cubic feet. Concrete, soil, gravel and mulch are measured in cubic yards.
- Cut sheet
- A cut sheet is a manufacturer's data sheet for one product. It shows the model, sizes, options and performance.
D
- Davis-Bacon
- Davis-Bacon is the US federal law that requires contractors to pay prevailing wages on federally funded construction projects.
- Delegated design
- Delegated design makes the contractor responsible for engineering part of the work, within criteria the designer sets.
- Design development
- Design development is the design phase between schematic design and construction documents. People shorten the term to DD.
- Design-build
- Design-build is a delivery method. One company holds a single contract with the owner for both design and construction.
- Detail
- A detail is a large-scale drawing of a small part of the work. It shows how the pieces fit together.
- Direct cost
- A direct cost is a cost tied to one specific job: labor, material, equipment and subcontracts used to build it.
- Division 01
- Division 01 is General Requirements in MasterFormat. Its sections set the administrative rules that apply to every trade on the job.
- Door schedule
- A door schedule is a table on the drawings with one row per door opening. It gives size, type, material, frame, rating and hardware set.
- Drawing set
- A drawing set is the full group of plan sheets for a project, ordered by discipline from civil through electrical.
E
- Each (EA)
- Each, written EA, is the unit of measure for items counted one by one.
- Elevation
- An elevation is a drawing that shows a vertical face of the building or a wall, viewed straight on. It also means a height above a reference point.
- Escalation
- Escalation is the rise in labor or material cost between the bid date and the date of purchase or installation.
- Estimate
- An estimate is a contractor's calculation of what a job will cost to build. It covers quantities, labor, material, equipment, overhead and profit.
- Estimator
- An estimator is the person who works out what a job will cost. The estimator reads the documents, takes off quantities and prices them.
- Exclusion
- An exclusion is a statement in a proposal that names work the bidder has not priced and will not perform.
F
- Finish schedule
- A finish schedule is a table on the drawings. It lists the floor, base, wall and ceiling finish for each room.
- Fixture schedule
- A fixture schedule is a table on the drawings. It lists each fixture type with its tag, description, manufacturer and model.
- Front-end documents
- Front-end documents are the bidding and contract sections at the start of the Project Manual. They are usually Division 00 and Division 01.
- Furnish and install
- Furnish and install means the contractor supplies the item and puts it in place. Furnish alone means supply only.
G
- General conditions
- General conditions are the standard contract terms. They set the rights and duties of the owner, the contractor and the architect.
- General contractor
- A general contractor holds the contract with the owner for the whole project. It hires subcontractors for most of the trade work.
- General notes
- General notes are written instructions on the drawings. They apply to a whole sheet, a whole discipline or the whole project.
H
- Hard bid
- A hard bid is a competitive lump sum bid on complete documents. The lowest responsive, responsible bidder usually wins.
I
- Inclusion
- An inclusion is a statement in a proposal that names the work the bidder has priced and will perform.
- Indirect cost
- An indirect cost supports the work but is not tied to one installed item. Examples are supervision, the job trailer and office overhead.
- Instructions to bidders
- Instructions to bidders is the front-end document that states the rules for preparing and submitting a bid.
- Invitation to bid
- An invitation to bid is a notice that asks contractors to bid a project. It gives the scope, the bid date and where to get the documents.
K
- Keynote
- A keynote is a numbered or lettered tag on a drawing. It points to a note in a list on the same sheet.
L
- Labor burden
- Labor burden is the cost an employer pays on top of base wages: payroll taxes, workers compensation insurance and benefits.
- Labor unit
- A labor unit is the number of labor hours needed to install one unit of an item. Examples are hours per fixture or per linear foot.
- Lead time
- Lead time is the time between placing an order and receiving the material on site. It includes submittal approval and manufacturing.
- Legend
- A legend is a key on the drawings that shows what each symbol, line type, hatch pattern and abbreviation means.
- Linear foot
- A linear foot is one foot of length, measured in a straight line along an item. Width and height do not count. It is written LF.
- Liquidated damages
- Liquidated damages are a set amount per day that the contract charges the contractor if the work finishes late.
- Low bidder
- The low bidder is the company with the lowest price among the bids received.
- Lump sum
- A lump sum is one fixed price for a defined scope of work. The contractor carries the risk of quantity and cost.
M
- Margin
- Margin is the part of the selling price that is left after cost. It is stated as a percent of the price.
- Markup
- Markup is the amount added to cost to reach the selling price. It is stated as a percent of cost.
- MasterFormat
- MasterFormat is the standard numbering system for construction specifications in the US and Canada. It sorts work into 50 divisions.
- Material quote
- A material quote is a supplier's price for a list of materials. The quantities come from the contractor or the supplier's own takeoff.
- Material takeoff
- A material takeoff is a list of the materials a job needs, with quantities measured or counted from the drawings.
- Means and methods
- Means and methods are the ways a contractor chooses to build the work: the techniques, sequence, equipment and temporary supports.
- Mock-up
- A mock-up is a full-size sample of part of the work. The architect approves its look and quality before the rest goes in.
N
- NIC (not in contract)
- NIC means not in contract. It marks an item that is shown on the drawings for reference but is not part of this construction contract.
- Notice to proceed
- A notice to proceed is the owner's written notice that tells the contractor to start work. It usually sets the start of the contract time.
O
- OFCI
- OFCI means owner furnished, contractor installed. The owner buys the item and the contractor installs it.
- OFOI
- OFOI means owner furnished, owner installed. The owner buys and installs the item, outside the construction contract.
- On-screen takeoff
- On-screen takeoff is measuring and counting from digital plan sheets on a computer. It replaces paper prints and a scale ruler.
- One-line diagram
- A one-line diagram is an electrical drawing that shows the power system with single lines and symbols. It runs from service to panels.
- Or equal
- Or equal is spec language that lets a bidder offer a product other than the one named. The product must match the named one.
- Overhead
- Overhead is the cost of running the company that no single job pays for directly. Examples are office rent, office staff and insurance.
- Owner furnished
- Owner furnished means the owner supplies the item. The contractor does not buy it, but may still have to install it.
P
- Panel schedule
- A panel schedule is a table on the electrical drawings. It lists each circuit in a panelboard, with its breaker size and load.
- Payment bond
- A payment bond is a surety's guarantee that the contractor will pay its subcontractors, suppliers and workers for the project.
- Performance bond
- A performance bond is a surety's guarantee that the contractor will complete the work as the contract requires.
- Plan room
- A plan room is a place, now usually a website. Contractors use it to find projects out for bid and download the bid documents.
- Plan sheet
- A plan sheet is one page of the drawing set. Each sheet has a number, a title and a title block.
- Plumbing riser
- A plumbing riser is a schematic drawing. It shows waste, vent and water piping as it runs up through the building.
- Pre-bid meeting
- A pre-bid meeting is held by the owner or architect before bid day. They explain the project and answer bidder questions.
- Pre-construction
- Pre-construction is the phase before work starts on site. It covers budgets, estimates, schedule planning, design review and buyout.
- Prequalification
- Prequalification is a review that an owner or general contractor uses to approve a company before that company may bid.
- Prevailing wage
- Prevailing wage is the minimum hourly wage and fringe rate that a public project requires for each trade classification.
- Prime contractor
- A prime contractor holds a contract directly with the owner. Subcontractors hold contracts with the prime, not with the owner.
- Project Manual
- The Project Manual is the bound book of written bid and contract documents. It holds the bidding requirements, contract conditions and specifications.
- Proposal
- A proposal is the written offer a contractor sends. It states the price, the scope, the inclusions, the exclusions and the terms.
- Punch list
- A punch list is the list of incomplete or defective items the architect or owner finds near project completion.
Q
- Qualification
- A qualification is a statement in a bid that explains an assumption or a condition behind the price.
- Quantity survey
- A quantity survey is a complete, detailed measurement of all the materials and work in a project. It comes from the drawings.
- Quantity takeoff
- A quantity takeoff is the list of measured and counted quantities for a job. It comes from the drawings and specifications.
R
- Record drawings
- Record drawings are the final set of drawings. They show the project as built, including changes made during construction.
- Reflected ceiling plan (RCP)
- A reflected ceiling plan is a drawing of the ceiling as if a mirror on the floor reflected it. It shows ceiling types, heights and devices.
- Responsible bidder
- A responsible bidder is a company that has the ability, the resources and the record to perform the contract.
- Responsive bid
- A responsive bid is a bid that meets every requirement of the bid documents in form, content and timing.
- Retainage
- Retainage is a share of each progress payment that the owner holds back until the work is complete.
- Revision cloud
- A revision cloud is a scalloped outline on a drawing that marks an area changed since the last issue.
- RFI (request for information)
- An RFI is a written question to the architect or owner. It asks about something unclear, missing or in conflict.
- RFP (request for proposal)
- An RFP is a request for an offer that the owner scores on more than price. Approach, team and schedule also count.
- RFQ (request for quote or qualifications)
- RFQ has two meanings. It can mean a request for a price quote, or a request for a firm's qualifications without a price.
- Riser diagram
- A riser diagram is a schematic drawing that shows how a system runs vertically through a building, floor by floor.
- Room finish schedule
- A room finish schedule is a table that lists the floor, base, wall and ceiling finish for each room.
- Rough order of magnitude (ROM)
- A rough order of magnitude is an early cost estimate made with little design information. It gives a range, not a firm price.
S
- Schedule of values (SOV)
- A schedule of values is a breakdown of the contract sum into line items. The contractor bills against it each month.
- Schematic design (SD)
- Schematic design is the first design phase. The drawings show the general layout, size and look of the building, with few details.
- Scope gap
- A scope gap is work the project needs that no bidder has included in a price.
- Scope letter
- A scope letter is a written statement from a subcontractor that lists what the bid includes, excludes and assumes.
- Scope of work
- The scope of work is the full description of what one party must do under a contract or a bid.
- Scope review
- A scope review is a meeting or checklist. The general contractor and a subcontractor confirm exactly what the sub's price includes.
- Section (drawing)
- A section is a drawing that shows a building or a part of it as if cut through vertically. It shows what is inside.
- Sheet index
- A sheet index is the list of every drawing sheet in the set, by number and title. It is usually on the cover sheet.
- Shop drawing
- A shop drawing is a drawing made by a contractor, fabricator or supplier. It shows exactly how they will build the work.
- Site plan
- A site plan is a drawing of the whole property from above. It shows the building, paving, utilities, grading and property lines.
- Soils report
- A soils report, or geotechnical report, describes the ground under a site. It is based on borings and lab tests.
- Spec book
- Spec book is the common name for the Project Manual, the bound volume of bidding requirements, contract conditions and specifications.
- Spec section
- A spec section is one numbered part of the specifications. It covers one type of work, such as 09 51 00 Acoustical Ceilings.
- Specification
- A specification is the written part of the contract documents. It states the products, the quality and the installation rules for the work.
- Square (roofing)
- A square is a roofing unit equal to 100 square feet of roof surface.
- Square foot (SF)
- A square foot is a unit of area equal to a square that is 1 ft on each side. Estimators write it as SF.
- Structural drawings
- Structural drawings show the parts that hold the building up: foundations, columns, beams, slabs, framing and connections.
- Sub bid
- A sub bid is the price and scope a subcontractor sends to a general contractor for one trade.
- Subcontractor
- A subcontractor is a company that does one part of the work. Its contract is with the general contractor, not the owner.
- Submittal
- A submittal is a document or sample a contractor sends to the architect before it orders. It shows what the contractor will furnish.
- Substitution request
- A substitution request is a formal request to use a product other than the one the specification names.
- Supplementary conditions
- Supplementary conditions are contract terms that change or add to the general conditions for one specific project.
- Supplier quote
- A supplier quote is a written price from a supplier or manufacturer for the materials or equipment on a job.
T
- Takeoff
- A takeoff is the work of measuring and counting everything a job needs from the drawings and specs. It is also the list that results.
- Takeoff sheet
- A takeoff sheet is the form or spreadsheet where an estimator records each item, quantity, unit and source.
- Tax exempt
- Tax exempt means the project owner does not pay sales tax on some or all purchases for the project.
- Time and materials (T&M)
- Time and materials is a way to pay for work by actual labor hours and material cost. Rates and markups are agreed in advance.
- Title block
- A title block is the bordered area on a drawing sheet. It holds the project name, sheet number, title, date, scale and revisions.
U
- Unit of measure (UOM)
- A unit of measure is the unit a quantity is counted or measured in. Examples are each, linear foot, square foot and cubic yard.
- Unit price
- A unit price is a fixed price for one unit of work. Examples are a cubic yard of rock excavation or a linear foot of pipe.
V
- Value engineering (VE)
- Value engineering is a review of the design. It looks for ways to lower cost while the building still does its job.
W
- Wall type
- A wall type is a coded wall assembly on the drawings. The code tells you the studs, the layers, the insulation and the rating.
- Warranty
- A warranty is a written promise to repair or replace defective work or products for a stated period after completion.
- Waste factor
- A waste factor is the extra material an estimator adds to the measured quantity. It covers cuts, breakage, laps and layout loss.