Electrical takeoff software
An electrical takeoff is counts first: devices, fixtures, panels and gear. The errors come from the schedules and the plans not matching. That is the part Takeoff Tool is built to catch.
Opening
This trade is not open yet. We are building it with founding contractors, who use Takeoff Tool three months free. The lists below show what the takeoff covers and what we teach it first.
The spec sections it reads
- 26 05 00Common work results for electrical
- 26 24 16Panelboards
- 26 27 26Wiring devices
- 26 51 00Interior lighting
What a electrical takeoff covers
- 01
Wiring devices
Receptacles, switches and boxes by type, counted on the power plans. - 02
Light fixtures
Counted by fixture type and tied to the fixture schedule. - 03
Panels and gear
Panelboards, transformers and disconnects from the one-line and the panel schedules. - 04
Low voltage rough-in
Boxes and pathways shown on the electrical sheets.
The conflicts we teach it first
These are the conflicts estimators in this trade tell us cost them money. They are the first rules we build with founding contractors.
- 01
Schedule and plan disagree
A fixture type on the plan that is not in the fixture schedule, or the reverse. - 02
One-line and panel schedule disagree
A panel on the one-line with no schedule, or a different size. - 03
Spec and plan disagree
Division 26 calls for one device grade and a plan note calls for another. - 04
Addenda
A late sheet that changes counts you already made.
Electrical: common questions
- Can I use Takeoff Tool for electrical takeoffs today?
- Not yet. Electrical is a founding trade. We build each trade with working estimators, so the tool learns how the trade really bids. Founding contractors use it free for three months while we build it with them.
- What do you need from a founding electrical contractor?
- An hour or two of your estimator's time, screen shared, while they do a real takeoff. Plus a set of past bid packets with the finished takeoffs. We use them to check the tool against work you already trust.
- What does it cost after the founding period?
- The standard price is $2,500 per seat per month. It is a flat fee. There is no charge per takeoff.
Guides and solutions
Other trades
- Gym and athletic equipment
- Plumbing
- Painting
- Framing
- Excavation and earthwork
- Roofing
- Tile and flooring
- HVAC
- Drywall and metal framing
- Concrete
- Masonry
- Fire protection
- Low voltage
- Doors, frames and hardware
- Glass and glazing
- Insulation
- Millwork and casework
- Structural steel
- Division 10 specialties
- Landscaping and irrigation
- Site utilities
- Acoustical ceilings
- Food service equipment
Help us build electrical takeoffs.
Founding contractors use Takeoff Tool three months free.