Concrete takeoff software
A concrete takeoff follows the schedules: footings, piers, walls and slabs. The structural sheets give the sizes and the reinforcing. The errors come from the general notes, the spec and the details not agreeing on mix, bar or finish.
Opening
This trade is not open yet. We are building it with founding contractors, who use Takeoff Tool three months free. The lists below show what the takeoff covers and what we teach it first.
The spec sections it reads
- 03 10 00Concrete forming and accessories
- 03 20 00Concrete reinforcing
- 03 30 00Cast-in-place concrete
- 03 35 00Concrete finishing
What a concrete takeoff covers
- 01
Footings and piers
Counted by mark and tied to the footing schedule. - 02
Walls and grade beams
Each type with its thickness and reinforcing, from the foundation plan and the sections. - 03
Slabs
Each slab area with its thickness, reinforcing and vapor barrier. - 04
Embeds and anchor bolts
Counted by type from the structural plans and details. - 05
Mix by element
The strength and mix class the spec or the general notes assign to each element. - 06
Finishes and joints
Slab finish by area, plus control and construction joints where the plans show them.
The conflicts we teach it first
These are the conflicts estimators in this trade tell us cost them money. They are the first rules we build with founding contractors.
- 01
Schedule and plan disagree
A footing mark on the foundation plan with no row in the footing schedule. - 02
Spec and general notes disagree
The spec calls for one concrete strength and the structural general notes call for another. - 03
Architectural and structural disagree
A slab edge, depression or curb the architect draws that the structural plan does not show. - 04
Missing sizes
A pier, pad or housekeeping curb with no dimension on any sheet. - 05
Embeds by others
Anchor bolts or embeds that another trade supplies and you set, or the reverse. - 06
Finish and flatness
A floor flatness or finish requirement in the spec that the finish schedule does not reflect.
Concrete: common questions
- Can I use Takeoff Tool for concrete takeoffs today?
- Not yet. Concrete is a founding trade. We build each trade with working estimators, so the tool learns how the trade really bids. Founding contractors use it free for three months while we build it with them.
- What do you need from a founding concrete contractor?
- An hour or two of your estimator's time, screen shared, while they do a real takeoff. Plus a set of past bid packets with the finished takeoffs. We use them to check the tool against work you already trust.
- What does it cost after the founding period?
- The standard price is $2,500 per seat per month. It is a flat fee. There is no charge per takeoff.
Guides and solutions
CSI divisions for this trade
Other trades
- Gym and athletic equipment
- Electrical
- Plumbing
- Painting
- Framing
- Excavation and earthwork
- Roofing
- Tile and flooring
- HVAC
- Drywall and metal framing
- Masonry
- Fire protection
- Low voltage
- Doors, frames and hardware
- Glass and glazing
- Insulation
- Millwork and casework
- Structural steel
- Division 10 specialties
- Landscaping and irrigation
- Site utilities
- Acoustical ceilings
- Food service equipment
- Lumber and building materials
- Rebar and reinforcing steel
- Remodeling and general contracting
Help us build concrete takeoffs.
Founding contractors use Takeoff Tool three months free.