What is a quantity takeoff in construction?

A quantity takeoff is the measured list of materials and items a job needs: how many, how long, how much area, how much volume. It is the counting part of an estimate.

The four kinds of quantity

  • Count. Items you count one by one: fixtures, doors, backstops.
  • Length. Items you measure in feet: pipe, conduit, base, wall pads.
  • Area. Items you measure in square feet: tile, paint, roofing.
  • Volume. Items you measure in cubic yards: concrete, excavation, fill.

Quantity takeoff and material takeoff

People use both names for the same work. A material takeoff lists materials only. A quantity takeoff can also include labor units and equipment. On most bids the two names mean the same list.

What a quantity takeoff does not include

It does not include prices. Unit costs, labor rates, overhead and profit are added in the estimate.