HVAC and mechanical takeoff software
An HVAC takeoff starts with the schedules: units, fans, terminal boxes and air devices. The plans say where each one goes and what duct feeds it. The errors come from a tag on the plan that the schedule does not carry, or the reverse.
Opening
This trade is not open yet. We are building it with founding contractors, who use Takeoff Tool three months free. The lists below show what the takeoff covers and what we teach it first.
The spec sections it reads
- 23 05 00Common work results for HVAC
- 23 07 00HVAC insulation
- 23 31 13Metal ducts
- 23 37 13Diffusers, registers and grilles
What a hvac takeoff covers
- 01
Equipment
Rooftop units, air handlers, split systems and fans, tied to the equipment schedules. - 02
Terminal units
VAV boxes and fan coils by tag, counted on the mechanical plans. - 03
Air devices
Diffusers, registers and grilles by type and neck size. - 04
Dampers
Fire, smoke and volume dampers where the plans and the life safety sheets show them. - 05
Duct by system
Supply, return and exhaust, with the material and pressure class the spec assigns to each. - 06
Insulation and lining
Which duct gets wrap, which gets liner and at what thickness, from the spec.
The conflicts we teach it first
These are the conflicts estimators in this trade tell us cost them money. They are the first rules we build with founding contractors.
- 01
Schedule and plan disagree
A VAV tag on the plan with no row in the schedule, or a scheduled unit that is never drawn. - 02
Spec and plan disagree
The spec calls for one duct construction and a plan note allows another. - 03
Mechanical and life safety disagree
A rated wall on the life safety plan with duct through it and no damper shown. - 04
Mechanical and structural disagree
A rooftop unit on the mechanical plan with no curb or framing on the structural sheets. - 05
By others
Controls, starters or line voltage wiring that the spec gives to another trade. - 06
Addenda
A revised equipment schedule after you sent the first one out for quotes.
HVAC: common questions
- Can I use Takeoff Tool for HVAC takeoffs today?
- Not yet. HVAC is a founding trade. We build each trade with working estimators, so the tool learns how the trade really bids. Founding contractors use it free for three months while we build it with them.
- What do you need from a founding HVAC contractor?
- An hour or two of your estimator's time, screen shared, while they do a real takeoff. Plus a set of past bid packets with the finished takeoffs. We use them to check the tool against work you already trust.
- What does it cost after the founding period?
- The standard price is $2,500 per seat per month. It is a flat fee. There is no charge per takeoff.
Guides and solutions
CSI divisions for this trade
Other trades
- Gym and athletic equipment
- Electrical
- Plumbing
- Painting
- Framing
- Excavation and earthwork
- Roofing
- Tile and flooring
- Drywall and metal framing
- Concrete
- Masonry
- Fire protection
- Low voltage
- Doors, frames and hardware
- Glass and glazing
- Insulation
- Millwork and casework
- Structural steel
- Division 10 specialties
- Landscaping and irrigation
- Site utilities
- Acoustical ceilings
- Food service equipment
- Lumber and building materials
- Rebar and reinforcing steel
- Remodeling and general contracting
Help us build hvac takeoffs.
Founding contractors use Takeoff Tool three months free.