Takeoff ToolTAKEOFF TOOL

Division 33: Utilities

Division 33 covers site utilities: water, sanitary sewer, storm drainage, fuel distribution, and site electrical and communications utilities.

MasterFormat group: Site and infrastructure

What Division 33 includes

  • Water utilities
  • Sanitary sewerage
  • Storm drainage
  • Manholes and structures
  • Fuel and gas distribution

Who bids Division 33

Site utility and excavation contractors.

What an estimator should check

  1. 01Where site utilities stop and building plumbing starts.
  2. 02Pipe inverts against finished grade.
  3. 03Work by the utility company.
  4. 04Connection and tap fees.

Takeoffs in Division 33

Takeoff Tool reads one spec section, counts the items on the plans and flags where the spec and the drawings disagree. Each trade page says if the trade is live or opening.

More divisions

Run a real bid packet through it.