Takeoff ToolTAKEOFF TOOL

Division 13: Special Construction

Division 13 covers special construction: pools, fountains, special purpose rooms, pre-engineered buildings and special structures.

MasterFormat group: Facility construction

What Division 13 includes

  • Swimming pools
  • Fountains
  • Controlled environment rooms
  • Metal building systems
  • Fabric and special structures

Who bids Division 13

Specialty builders and metal building suppliers.

What an estimator should check

  1. 01Delegated design and engineering.
  2. 02Foundations by the concrete contractor.
  3. 03Utility connections by other trades.

More divisions

Run a real bid packet through it.